Amplify Capital is proud to present the Spartina Creek Building for lease with its magnificent views of Shem Creek in Mount Pleasant. This two phase development consists of a 10,300sf flex/office building that was completed in December 2025 and is now 75% leased. Phase two will consist of a 19,000sf two-story building, that has floors of 9,500sf and can be demised down to 3,500sf spaces. The central location of this development in the heart of Mount Pleasant allows easy access to Interstate 526 as well as to Downtown Charleston. Amenities will include a deck overlooking Shem Creek and a wellness lawn that will allow tenants the ability to work or have events with the outstanding creek views.
The 10,300sf building was completed in December 2025 with the first tenants moving into their spaces during December 2025. The third space is currently in design and permitting with the tenant expected to move in during the summer of 2026. One interior space is available at +/-2,600sf. Rent starts at $41.00/sf NNN, but depends on space, size and term of lease.
Contact us today to lease your space with fantastic views.
Completed Building
Shared Patio that overlooks the pond and Shem Creek
Patio Views of Pond and Shem Creek
Suite 103
Suite 104
Suite 102 Core
Suite 102 Entrance
Suite 102 Break Area
Suite 102 Bathroom
Suite 101 Entrance
Suite 101
Suite 101 Media Wall
November 2025 - Near Completion
November 2025 - Roll-up Door Side
November 2025 - View from Patio to Shem Creek
November 2025 - Shared Patio
November 2025 - Interior Suite 102
November 2025 - Break Room Suite 102
November 2025 - Suite 103 & 104 Interior Shell
November 2025 - Suite 103 & 104 Interior Shell from Side
September 2025 - Front of Building
Left Front of Building - September 2025
Right Front Side of Building September 2025
Right Side Canopy - September 2025
Private Office Open Concept Space - September 2025
Tenant Office Space - September 2025
Tenant Office Space September 2025
Shell Tenant Space September 2025
Shell office space towards patio - September 2025
Shell space towards interior unit September 2025
Shared Covered Patio September 2025
Covered Patio September 2025
View to Pond and Shem Creek from Patio - September 2025
From of building in June 2026
Construction - July 2025
June 2025 Available Space
Construction - July 2025
Available Space Construction Photo - June 2025
Available Space view to Patio
Interior Construction
Framing of 10,000 SF building
View of 10,000 SF building from pond
Initial Structural Beam
April 2025 - Building Pad
Building Pad for 10,300 SF Building
Future Building Pad for Phase 2
Building 1 building pad location
Pre-Construction view of site
Pre-construction view from back up property out to Shem Creek